564UK data centres cited as listed by the BBC, 29 July 2026
125 GWelectricity connection capacity requested, up from 41 GW in one year
£237,500–£712,500/MWOfgem's proposed refundable connection deposit range
Open repository Code, data contracts and development Develop the data-centre layer independently without burying it inside the main GlobalGrid2050 repository. Open API Source-separated data adapter FastAPI service with provenance labels, retrieval timestamps, caching and conservative parsing. Source · separate Data Center Map · London Public directory source retained separately rather than silently merged into a single untraceable dataset. Context source BBC · grid-connection demand Public context for the rapid increase in connection requests and Ofgem's proposed deposit mechanism. World-grid platform Return to GlobalGrid2050 Connect this independent dataset to the wider grid-development, engineering and infrastructure platform. Federation The Spider 🕷 Inspect the relationship between this repository, the current homepage, the next homepage and the wider federation.

Source records remain source-labelled. Counts, ownership, operational status, coordinates and power demand must not be treated as verified merely because a listing exists. Future sources should be added through separate adapters and reconciled only through explicit evidence rules.